Comprehensive guide examining analytical methods used to devise an efficient and successful schedule for construction projects of all sizes
The newly revised and updated Fifth Edition of Construction Project Scheduling and Control describes the tools and methods that make projects run smoothly, with invaluable information from a noted career construction professional, along with updated information on Building Information Modeling (BIM) and new technologies impacting project scheduling. The first chapter is now replaced by two chapters on planning and scheduling, separately. A new chapter on optimizing the schedule that applies all scheduling concepts has been added. The book also includes worked problems and exercises with scheduling software hints to enable students and practicing professionals to apply critical thinking to issues in construction scheduling.
This Fifth Edition includes a revised chapter on the definition of the critical path, which follows a discussion of resource management, schedule updating and project control, schedule acceleration, risk, and other topics. This edition also includes numerous notes on all aspects of the project that may impact the schedule. In addition, it features a chapter on project scheduling and control as viewed through the owner’s perspective, as well as an expanded glossary, a list of acronyms, and more. Instructors who adopt this book will be provided with valuable materials including PowerPoint lecture slides, an instructor’s manual with complete solutions to the book’s exercises, and additional questions for exams.
Sample topics covered in Construction Project Scheduling and Control include:
Written for undergraduate and graduate students in construction management, civil engineering, and architecture, as well as practicing construction management professionals, the Fifth Edition of Construction Project Scheduling and Control is an essential resource for gaining a foundational understanding of the field, along with the latest and most effective practices.
Table of Contents
Chapter 1 Introduction to Project Planning
Chapter 2 Introduction to Project Scheduling
Chapter 3 Bar (Gantt) Charts
Chapter 4 Basic Logic Networks
Chapter 5 The Critical Path Method (CPM)
Chapter 6 Precedence Networks
Chapter 7 Resource Management
Chapter 8 Schedule Updating and Project Control
Chapter 9 Schedule Acceleration and Time-Cost Trade-Off
Chapter 10 Reports and Presentations
Chapter 11 Scheduling as Part of the Project Management Effort
Chapter 12 Other Scheduling Methods
Chapter 13 Dynamic Minimum Lag Relationship
Chapter 14 Schedule Risk Management
Chapter 15 Construction Delays and Other Claims
Chapter 16 Optimizing the CPM Schedule
Chapter 17 The Critical Path Definition: Revisited
Chapter 18 BIM and Other Technologies in Modern Construction Scheduling
Chapter 19 Project Scheduling for Owners
Dr. Saleh Mubarak (Tampa, FL) is a professor and an independent consultant in construction project management, focused on training, writing, public speaking, and consulting. He is an adjunct professor at the University of South Florida (USF) and a former professor at several universities. He is also an active member of AACE International and a former member of PMI. He served on the PMI committee that created the professional scheduler certification exam. He has more than 35 years of diversified and international experience in academia and industry in private and public sectors.